Sunday, October 17, 2010

Spent most of the day outside.

Usually, that might mean one enjoyed themselves, but for me, today was all about work.

Raked Leaves
Cut the grass
Power Washed the drive way.

Then 6 hours of driveway crack filling.  Yes, 6 hours.   I used 4, 24lb buckets of Trowel fill. It was like frosting a really big cake, only not so tasty, and you have to be on your hands and knees the whole time.

Now, to wait a least week before spending another day sealing it.  Ug.